Construction “Hight voltage line 110kV Fiber – Librazhd and two tract in which substation Fiber and Librazhd” ,
Investment 3,300,000 Euro, (Finished )
The overall Project
- 2 tract with primary elements, control and protect panel.
- 22.4 km line
- 650 Ton Tower
- 2200 m3 concrete
- 23 km OPGV
- 134 km conductor